Investment Case Details
Mining & Resources(Package 1 – Pilbara Rare Earths Extraction & Processing Facility)
A$83,764.00
A$254,805.00
| ⛏ | Co-invest in the open-pit mine development and ore handling systems — the physical groundwork of a Pilbara rare earths project tapping some of the world's richest reserves of neodymium, praseodymium, and dysprosium. |
|
Daily accrual
~0.60%
per day
|
Annualised target
~219%
over term
|
Term length
300–400
days
|
| ✓ | Case ID: 1T25METB99S4 |
| ✓ | Target term: 300–400 days (buffer up to +60 days with notice) |
| ✓ | Withdrawals: On request. Same-day for smaller amounts; larger sums released in tranches over several days. |
| ✓ | Capital Back: Yes — at project finish |
| ✓ | Dashboard tracking: Daily accruals, transaction history, withdrawal records, and case updates are visible through the investor account. |
| ✓ | Updates: 15–20 minute phone briefing with a dedicated team member on request. |
| ⓘ | All figures are targets, not guarantees. Capital is at risk. Full terms in the offer documents. |
| 01 | Package Summary |
The Pilbara Rare Earths Extraction & Processing Facility is designed to secure Australia's position as a critical supplier of rare earth minerals essential for electric vehicles, wind turbines, advanced electronics, and defence applications. Located in a high-grade deposit zone in the Pilbara region, this project taps into some of the world's richest reserves of neodymium, praseodymium, and dysprosium — minerals vital for high-performance magnets and clean energy technology.
Package 1 focuses on the physical development of the open-pit mine and the ore handling infrastructure required to transport raw material for initial processing.
| 02 | Scope of Works |
Open-pit mine development and ore handling are the enabling layer for the entire facility — mining cannot begin without site preparation and haul infrastructure. Developed mines generate decades of returns, and rare earths are classified as critical minerals on Australia's strategic supply list, with demand surging for renewable energy and high-tech manufacturing.
| 03 | Schedule & Milestones |
| 1 | Mobilisation and mine site clearing |
| 2 | Overburden removal and site preparation |
| 3 | Drilling and controlled blasting operations |
| 4 | Primary haul road construction |
| 5 | Ore loading and crushing station installation |
| 6 | Dust suppression and environmental control systems |
| 7 | Heavy equipment procurement and commissioning |
| 8 | Weighbridge, security systems, and handover to processing |
| 04 | Use of Funds |
| Mine site clearing and overburden removal |
| Drilling and blasting operations |
| Primary haul road construction |
| Ore loading and crushing stations |
| Dust suppression and environmental controls |
| Heavy equipment procurement (excavators, haul trucks) |
| Weighbridge and security systems |
| 05 | How the Process Works |
From start to allocation in 5 clear steps
| 1 | Start AllocationClick "Start Allocation" on this page to begin |
| 2 | Complete KYCShort identity verification in your account |
| 3 | Receive DocumentsPDS + TMD (retail) or IM (wholesale) by email |
| 4 | Fund Your AccountBank transfer to a secure allocation account, or approved crypto |
| 5 | Allocate & TrackAllocation confirmed on cleared funds; track accruals through your dashboard |
| ⓘ | Returns are targets, not guarantees; capital is at risk. Application monies are received into a secure allocation account designated for the offer. |
| 06 | Fees |
| 3% | Management fee — of principal per term, deducted from principal at maturity. Profits untouched. |
| ⚠ | Key Risks |
Construction and schedule; geotechnical and ore-body conditions; commodity price variability; environmental and mining permitting; heavy equipment procurement; cost escalation; counterparty and operational dependencies.
| ★ | Strategic Rationale |
|
⛏
Critical First Step
Mining can't begin without site preparation and haul infrastructure.
|
⏳
Long-Term Asset Value
Developed mines generate decades of returns.
|
|
🌏
Export Demand
Rare earth demand is surging for renewable energy and high-tech manufacturing.
|
📋
Government Priority
Rare earths are classified as critical minerals in Australia's strategic supply list.
|
Comments
Review
Package 1 targets approximately 0.60% in daily accruals over a 12-month term (operating window 300–400 days) — translating to roughly 210% total over a typical 350-day cycle, equivalent to an annualised target of around 219%. Returns are tracked transparently from the day your allocation is confirmed, with full conditions detailed in the offer documents.
Allocations to Package 1 start at A$400 and extend up to A$20,000 per investor. Wholesale and Professional investors may discuss larger allocations directly with our team, subject to availability and applicable documentation.
Your principal is returned in full at the completion of the project, typically within the 12-month term (operating window 300–400 days). A buffer of up to +60 days is allowed for construction variability, with any changes communicated in advance through your dashboard.
Yes. While the principal remains allocated to the project until completion, accrued profits can be withdrawn at any time through your dashboard. Smaller amounts are processed same-day; larger sums are released in tranches over several days.
A single 3% administration fee on capital is deducted from the returned principal at maturity. Accrued profits are paid in full — there are no performance fees, exit fees, or hidden charges.
Accruals begin on the day your funds clear and your allocation is confirmed. Each daily accrual is visible in your dashboard from that point forward.
REOCORP PTY LTD is an Australian private company focused on infrastructure, energy, resources, and essential project operations. REO provides case-specific participation opportunities connected to selected real-asset projects, with allocations administered directly through its investor platform and supporting offer documents. Company details are publicly verifiable through Australian business registers under ABN 13 620 130 958.
Yes. REO accepts participants from Australia and overseas. Registration is straightforward — create your account, complete the standard KYC check, then you can review the available package and choose your allocation through the dashboard.
Yes. REO support is available if you would like to speak with someone directly before moving forward. A team member can walk you through the opportunity, answer questions, and help make the process clearer. For larger allocations, an account manager may also be assigned to assist with setup and ongoing account support.
Once KYC is complete, allocations are funded via secure bank transfer to a designated allocation account, or through approved crypto channels. Account details and instructions are included in the offer documents.
Your dashboard provides a complete view of your position — current balance, accrual history, transaction log, withdrawal records, and personal profile — accessible at any time.
Most investors complete agreement, document review, and KYC verification within 24 hours. Allocation typically settles on the same business day once funds are received.
Open-pit mine development and ore handling infrastructure form the enabling layer for any rare earths operation — without site clearing, haul roads, crushing stations, and equipment, no ore can be extracted or processed. Civil and earthmoving works of this class create long-life productive assets, with developed mines generating returns across decades of operation. Rare earth elements such as neodymium, praseodymium, and dysprosium are classified as critical minerals on Australia's strategic supply list, underpinning high-performance magnets for electric vehicles, wind turbines, advanced electronics, and defence applications. Within this project, Package 1 establishes the physical mining base that every later processing and export stage depends on, while securing early-stage exposure to surging global demand for critical minerals. As an asset class, mine development infrastructure sits among the foundational categories of real-asset investment in Australia, with long productive life and strategic government backing.
Click "Start Allocation" on this page, complete the short KYC verification, and fund your account. Once your funds clear, choose Package 1, allocate your preferred amount, and your dashboard will show your active position, daily accruals, and transaction history. Package 1 remains available only while allocation capacity is open.
Mining & Resources (Package 1: Open-Pit Mine Development & Ore Handling Systems – Pilbara Rare Earths Extraction & Processing Facility)
- Min A$400.00
- Max A$20,000.00
- Target daily ~ 0.60%
- Accrual days ~ 350
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Agreement Paper
Mining & Resources (Package 1: Open-Pit Mine Development & Ore Handling Systems – Pilbara Rare Earths Extraction & Processing Facility)
- Min A$400.00
- Max A$20,000.00
- Target daily ~ 0.60%
- Accrual days ~ 350
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Cases Info
- Raised AmountA$83,764.00
- Goal AmountA$254,805.00
- Created At 2025-08-11