Investment Case Details
Infrastructure & Transport (Package 2 – Highway Expansion & Modernisation Project)
A$119,831.00
A$552,086.00
| 🛣 | Co-invest in the paving and surfacing stage of the Highway Expansion & Modernisation Project — transforming the prepared base into a durable, high-performance roadway built for decades of heavy traffic and harsh weather. |
|
Daily accrual
~0.48%
per day
|
Annualised target
~175%
over term
|
Term length
240–300
days
|
| ✓ | Case ID: 5RNJCUES8VUH |
| ✓ | Target term: 240–300 days (buffer up to +60 days with notice) |
| ✓ | Withdrawals: On request. Same-day for smaller amounts; larger sums released in tranches over several days. |
| ✓ | Capital Back: Yes — at project finish |
| ✓ | Dashboard tracking: Daily accruals, transaction history, withdrawal records, and case updates are visible through the investor account. |
| ✓ | Updates: 15–20 minute phone briefing with a dedicated team member on request. |
| ⓘ | All figures are targets, not guarantees. Capital is at risk. Full terms in the offer documents. |
| 01 | Package Summary |
This stage of the Highway Expansion & Modernisation Project focuses on transforming the prepared base into a durable, high-performance roadway. By integrating advanced surfacing materials, precise grading, and robust drainage systems, Package 2 ensures the highway will handle decades of heavy traffic, harsh weather, and regional growth demands.
| 02 | Scope of Works |
Paving and surfacing is the durability-defining stage of any major road project — the quality of the surface determines safety, comfort, and life expectancy. Polymer-modified asphalt mixes and engineered drainage can extend maintenance intervals by 10–15 years, supporting uninterrupted flow of goods, services, and commuters across the upgraded corridor.
| 03 | Schedule & Milestones |
| 1 | Mobilisation and asphalt mix plant setup |
| 2 | Asphalt and concrete paving across the expansion segment |
| 3 | Surface compaction with rollers and graders |
| 4 | Drainage system, culvert, and roadside drain installation |
| 5 | Road markings and safety lining application |
| 6 | Shoulder stabilisation and erosion controls |
| 7 | Load testing and handover |
| 04 | Use of Funds |
| Asphalt and concrete paving materials |
| Surface compaction equipment and labour |
| Drainage systems, culverts, and channels |
| Thermoplastic road markings and safety lining |
| Shoulder stabilisation and reinforcement materials |
| Quality testing and load verification |
| Project management and supervision |
| 05 | How the Process Works |
From start to allocation in 5 clear steps
| 1 | Start AllocationClick "Start Allocation" on this page to begin |
| 2 | Complete KYCShort identity verification in your account |
| 3 | Receive DocumentsPDS + TMD (retail) or IM (wholesale) by email |
| 4 | Fund Your AccountBank transfer to a secure allocation account, or approved crypto |
| 5 | Allocate & TrackAllocation confirmed on cleared funds; track accruals through your dashboard |
| ⓘ | Returns are targets, not guarantees; capital is at risk. Application monies are received into a secure allocation account designated for the offer. |
| 06 | Fees |
| 3% | Management fee — of principal per term, deducted from principal at maturity. Profits untouched. |
| ⚠ | Key Risks |
Construction and schedule; weather variability; asphalt material supply and pricing; equipment availability; environmental and traffic management; cost escalation; counterparty and operational dependencies.
| ★ | Strategic Rationale |
|
🛣
Direct Impact on Usability
Surfacing quality determines road safety, comfort, and life expectancy.
|
⏳
Long-Term Durability
Paving and drainage can extend maintenance intervals by 10–15 years.
|
|
🌧
Weather Resilience
Engineered to withstand both extreme heat and heavy rainfall.
|
📦
Regional Connectivity
Ensures uninterrupted flow of goods, services, and commuters.
|
Comments
Review
Package 2 targets approximately 0.48% in daily accruals over a 9-month term (operating window 240–300 days) — translating to roughly 130% total over a typical 270-day cycle, equivalent to an annualised target of around 175%. Returns are tracked transparently from the day your allocation is confirmed, with full conditions detailed in the offer documents.
Allocations to Package 2 start at A$2,500 and extend up to A$50,000 per investor. Wholesale and Professional investors may discuss larger allocations directly with our team, subject to availability and applicable documentation.
Your principal is returned in full at the completion of the project, typically within the 9-month term (operating window 240–300 days). A buffer of up to +60 days is allowed for construction variability, with any changes communicated in advance through your dashboard.
Yes. While the principal remains allocated to the project until completion, accrued profits can be withdrawn at any time through your dashboard. Smaller amounts are processed same-day; larger sums are released in tranches over several days.
A single 3% administration fee on capital is deducted from the returned principal at maturity. Accrued profits are paid in full — there are no performance fees, exit fees, or hidden charges.
Accruals begin on the day your funds clear and your allocation is confirmed. Each daily accrual is visible in your dashboard from that point forward.
REOCORP PTY LTD is an Australian private company focused on infrastructure, energy, resources, and essential project operations. REO provides case-specific participation opportunities connected to selected real-asset projects, with allocations administered directly through its investor platform and supporting offer documents. Company details are publicly verifiable through Australian business registers under ABN 13 620 130 958.
Eligible investors based in Australia and overseas are welcome. A standard KYC process classifies investors as Retail or Wholesale / Professional, ensuring the correct offer documentation applies — PDS and TMD for Retail investors, IM for Wholesale and Professional investors. Onboarding is fully digital and typically completed within 24 hours.
Yes. Support is available throughout the process — a 15–20 minute phone briefing with a team member can be arranged on request. Larger allocations are supported by a named account manager who remains available for the duration of the term.
Once KYC is complete, allocations are funded via secure bank transfer to a designated allocation account, or through approved crypto channels. Account details and instructions are included in the offer documents.
Your dashboard provides a complete view of your position — current balance, accrual history, transaction log, withdrawal records, and personal profile — accessible at any time.
Most investors complete agreement, document review, and KYC verification within 24 hours. Allocation typically settles on the same business day once funds are received.
Road surfacing and drainage systems form the durability layer of every major highway in Australia. Polymer-modified asphalt mixes and engineered drainage are designed to extend maintenance intervals by 10–15 years compared to traditional surfaces, and well-built road surfaces typically deliver service lives of 15–20 years before major resurfacing is required. Within the Highway Expansion & Modernisation Project, Package 2 establishes the active wearing surface that the public uses daily — the layer that directly determines the road's safety profile, load capacity, and economic life. As an asset class, road surfacing infrastructure sits among the more durable categories of real-asset investment in Australia, with revenue mechanisms ranging from government usage payments to direct tolling schemes depending on the corridor.
Click "Start Allocation" on this page, complete the short KYC verification, and fund your account. Once your funds clear, choose Package 2, allocate your preferred amount, and your dashboard will show your active position, daily accruals, and transaction history. Package 2 remains available only while allocation capacity is open.
Infrastructure & Transport (Package 2: Paving, Road Surfacing & Drainage – Highway Expansion & Modernisation Project)
- Min A$2,500.00
- Max A$50,000.00
- Target daily ~ 0.48%
- Accrual days ~ 270
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Agreement Paper
Infrastructure & Transport (Package 2: Paving, Road Surfacing & Drainage – Highway Expansion & Modernisation Project)
- Min A$2,500.00
- Max A$50,000.00
- Target daily ~ 0.48%
- Accrual days ~ 270
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Cases Info
- Raised AmountA$119,831.00
- Goal AmountA$552,086.00
- Created At 2025-06-17