Investment Case Details
Water Security (Package 1 – Coastal Desalination & Water Resilience Project)
A$87,684.00
A$273,982.00
| 💧 | Co-invest in the site preparation and seawater intake systems — the foundational marine infrastructure that delivers stable, clean seawater to a climate-independent desalination plant securing long-term water supply for coastal communities and industry. |
|
Daily accrual
~0.45%
per day
|
Annualised target
~164%
over term
|
Term length
250–320
days
|
| ✓ | Case ID: 6U51GEXHEJJ2 |
| ✓ | Target term: 250–320 days (buffer up to +60 days with notice) |
| ✓ | Withdrawals: On request. Same-day for smaller amounts; larger sums released in tranches over several days. |
| ✓ | Capital Back: Yes — at project finish |
| ✓ | Dashboard tracking: Daily accruals, transaction history, withdrawal records, and case updates are visible through the investor account. |
| ✓ | Updates: 15–20 minute phone briefing with a dedicated team member on request. |
| ⓘ | All figures are targets, not guarantees. Capital is at risk. Full terms in the offer documents. |
| 01 | Package Summary |
The Coastal Desalination & Water Resilience Project aims to secure a long-term, climate-independent water supply for coastal communities and industry by harnessing advanced seawater desalination technology. While later packages will handle water treatment, distribution, and energy optimisation, Package 1 focuses on the foundation — preparing the site and installing high-capacity seawater intake systems to feed the desalination plant.
This stage ensures stable, clean seawater delivery with minimal environmental disruption, setting the stage for the plant's operational success.
| 02 | Scope of Works |
Site preparation and seawater intake is the foundation for the entire plant — without the intake system, no desalination can occur. Marine pipelines and intake structures have 30+ year design lifespans, meet international marine protection standards to reduce operational risk, and are designed to support future plant expansions without major modifications.
| 03 | Schedule & Milestones |
| 1 | Mobilisation and coastal site survey |
| 2 | Marine works (submerged intake pipeline construction) |
| 3 | Seawater screening station installation |
| 4 | Coastal civil works (foundations, shoreline protection) |
| 5 | Pumping facility installation (variable speed drives) |
| 6 | Environmental protection measures (fish-friendly heads, monitoring) |
| 7 | Commissioning and seawater delivery verification |
| 04 | Use of Funds |
| Marine works (submerged intake pipelines) |
| Seawater screening stations (self-cleaning filters) |
| Coastal civil works (foundations, shoreline protection) |
| Pumping facilities (variable speed drives) |
| Environmental protection measures |
| Monitoring stations and compliance works |
| Commissioning and testing |
| 05 | How the Process Works |
From start to allocation in 5 clear steps
| 1 | Start AllocationClick "Start Allocation" on this page to begin |
| 2 | Complete KYCShort identity verification in your account |
| 3 | Receive DocumentsPDS + TMD (retail) or IM (wholesale) by email |
| 4 | Fund Your AccountBank transfer to a secure allocation account, or approved crypto |
| 5 | Allocate & TrackAllocation confirmed on cleared funds; track accruals through your dashboard |
| ⓘ | Returns are targets, not guarantees; capital is at risk. Application monies are received into a secure allocation account designated for the offer. |
| 06 | Fees |
| 3% | Management fee — of principal per term, deducted from principal at maturity. Profits untouched. |
| ⚠ | Key Risks |
Construction and schedule; marine and coastal construction conditions; intake equipment integration; seawater quality and environmental permitting; storm and weather exposure; cost escalation; counterparty and operational dependencies.
| ★ | Strategic Rationale |
|
🏗
Foundation for the Entire Plant
Without the intake system, no desalination can occur.
|
🌊
Long Asset Life
Marine pipelines and intake structures have 30+ year design lifespans.
|
|
🌱
Environmental Compliance
Meets international marine protection standards, reducing operational risk.
|
🚀
Scalable Capacity
Intake system is designed to support future plant expansions without major modifications.
|
Comments
Review
Package 1 targets approximately 0.45% in daily accruals over a 9-month term (operating window 250–320 days) — translating to roughly 126% total over a typical 280-day cycle, equivalent to an annualised target of around 164%. Returns are tracked transparently from the day your allocation is confirmed, with full conditions detailed in the offer documents.
Allocations to Package 1 start at A$400 and extend up to A$20,000 per investor. Wholesale and Professional investors may discuss larger allocations directly with our team, subject to availability and applicable documentation.
Your principal is returned in full at the completion of the project, typically within the 9-month term (operating window 250–320 days). A buffer of up to +60 days is allowed for construction variability, with any changes communicated in advance through your dashboard.
Yes. While the principal remains allocated to the project until completion, accrued profits can be withdrawn at any time through your dashboard. Smaller amounts are processed same-day; larger sums are released in tranches over several days.
A single 3% administration fee on capital is deducted from the returned principal at maturity. Accrued profits are paid in full — there are no performance fees, exit fees, or hidden charges.
Accruals begin on the day your funds clear and your allocation is confirmed. Each daily accrual is visible in your dashboard from that point forward.
REOCORP PTY LTD is an Australian private company focused on infrastructure, energy, resources, and essential project operations. REO provides case-specific participation opportunities connected to selected real-asset projects, with allocations administered directly through its investor platform and supporting offer documents. Company details are publicly verifiable through Australian business registers under ABN 13 620 130 958.
Yes. REO accepts participants from Australia and overseas. Registration is straightforward — create your account, complete the standard KYC check, then you can review the available package and choose your allocation through the dashboard.
Yes. REO support is available if you would like to speak with someone directly before moving forward. A team member can walk you through the opportunity, answer questions, and help make the process clearer. For larger allocations, an account manager may also be assigned to assist with setup and ongoing account support.
Once KYC is complete, allocations are funded via secure bank transfer to a designated allocation account, or through approved crypto channels. Account details and instructions are included in the offer documents.
Your dashboard provides a complete view of your position — current balance, accrual history, transaction log, withdrawal records, and personal profile — accessible at any time.
Most investors complete agreement, document review, and KYC verification within 24 hours. Allocation typically settles on the same business day once funds are received.
Seawater intake infrastructure is the foundational layer of any desalination operation — without submerged intake pipelines, screening stations, and pumping facilities, no seawater can be delivered to the plant and no fresh water can be produced. Marine civil assets of this class are among the most enduring real-asset categories, with intake pipelines and structures engineered for 30+ year design lifespans using corrosion-resistant materials. Desalination provides a climate-independent water supply, decoupling coastal communities and industry from drought and rainfall variability. Fish-friendly intake heads, self-cleaning screening, and monitoring stations ensure compliance with international marine protection standards, reducing operational and regulatory risk. Within the Coastal Desalination & Water Resilience Project, Package 1 establishes the intake base that every later treatment and distribution stage depends on, designed to support future plant expansions. As an asset class, desalination intake infrastructure sits among the most durable categories of real-asset investment in Australia, underpinned by essential, climate-resilient water demand.
Click "Start Allocation" on this page, complete the short KYC verification, and fund your account. Once your funds clear, choose Package 1, allocate your preferred amount, and your dashboard will show your active position, daily accruals, and transaction history. Package 1 remains available only while allocation capacity is open.
Water Security (Package 1: Site Preparation & Seawater Intake Systems – Coastal Desalination & Water Resilience Project)
- Min A$400.00
- Max A$20,000.00
- Target daily ~ 0.45%
- Accrual days ~ 280
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Agreement Paper
Water Security (Package 1: Site Preparation & Seawater Intake Systems – Coastal Desalination & Water Resilience Project)
- Min A$400.00
- Max A$20,000.00
- Target daily ~ 0.45%
- Accrual days ~ 280
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Cases Info
- Raised AmountA$87,684.00
- Goal AmountA$273,982.00
- Created At 2025-04-26