Investment Case Details
Waste & Recycling (Package 3 – Urban Circular Economy Project)
A$136,858.00
A$271,385.00
| ♻️ | Co-invest in the waste-to-energy conversion facility — the transformative stage that converts non-recyclable residual waste into renewable electricity fed directly into Australia's power grid. |
|
Daily accrual
~0.70%
per day
|
Annualised target
~256%
over term
|
Term length
280–360
days
|
| ✓ | Case ID: 7O11UAW1KM8R |
| ✓ | Target term: 280–360 days (buffer up to +60 days with notice) |
| ✓ | Withdrawals: On request. Same-day for smaller amounts; larger sums released in tranches over several days. |
| ✓ | Capital Back: Yes — at project finish |
| ✓ | Dashboard tracking: Daily accruals, transaction history, withdrawal records, and case updates are visible through the investor account. |
| ✓ | Updates: 15–20 minute phone briefing with a dedicated team member on request. |
| ⓘ | All figures are targets, not guarantees. Capital is at risk. Full terms in the offer documents. |
| 01 | Package Summary |
Package 3 focuses on the final and most transformative stage of the Urban Circular Economy Project: converting non-recyclable residual waste into renewable energy. By integrating advanced thermal treatment technologies, this facility will not only reduce landfill dependency but also generate a steady supply of clean electricity to feed into Australia's power grid.
This package turns waste into a long-term revenue stream while supporting the country's waste reduction and renewable energy goals.
| 02 | Scope of Works |
Package 3 is the value-maximisation stage — monetising residual waste by turning non-recyclables into a high-value energy product. The facility supplies renewable electricity directly to the grid, drastically reduces methane emissions from landfill, and delivers dual revenue streams: energy sales plus the sale of ash by-products as construction material.
| 03 | Schedule & Milestones |
| 1 | Mobilisation and facility site preparation |
| 2 | High-efficiency incineration unit installation |
| 3 | Flue gas cleaning system construction |
| 4 | Steam and power generation turbine setup |
| 5 | Residual by-product (ash to aggregate) handling systems |
| 6 | Grid integration and CEMS installation |
| 7 | Commissioning and first electricity export |
| 04 | Use of Funds |
| High-efficiency waste incineration units |
| Advanced flue gas cleaning systems |
| Steam and power generation turbines |
| Residual by-product handling (ash to aggregate) |
| Grid integration infrastructure and metering |
| Continuous Emission Monitoring Systems (CEMS) |
| Commissioning and grid synchronisation |
| 05 | How the Process Works |
From start to allocation in 5 clear steps
| 1 | Start AllocationClick "Start Allocation" on this page to begin |
| 2 | Complete KYCShort identity verification in your account |
| 3 | Receive DocumentsPDS + TMD (retail) or IM (wholesale) by email |
| 4 | Fund Your AccountBank transfer to a secure allocation account, or approved crypto |
| 5 | Allocate & TrackAllocation confirmed on cleared funds; track accruals through your dashboard |
| ⓘ | Returns are targets, not guarantees; capital is at risk. Application monies are received into a secure allocation account designated for the offer. |
| 06 | Fees |
| 3% | Management fee — of principal per term, deducted from principal at maturity. Profits untouched. |
| ⚠ | Key Risks |
Construction and schedule; thermal treatment and turbine technology integration; emissions compliance and monitoring; energy and by-product price variability; grid connection clearance; cost escalation; counterparty and operational dependencies.
| ★ | Strategic Rationale |
|
💰
Monetises Residual Waste
Turns non-recyclables into a high-value energy product.
|
⚡
Energy Security Contribution
Supplies renewable electricity directly to the grid.
|
|
🌱
Carbon Offset Benefits
Drastically reduces methane emissions from landfill.
|
📈
Dual Revenue Streams
Energy sales + sale of by-products as construction material.
|
Comments
Review
Package 3 targets approximately 0.70% in daily accruals over an 11-month term (operating window 280–360 days) — translating to roughly 231% total over a typical 330-day cycle, equivalent to an annualised target of around 256%. Returns are tracked transparently from the day your allocation is confirmed, with full conditions detailed in the offer documents.
Allocations to Package 3 start at A$5,000 and extend up to A$250,000 per investor. Wholesale and Professional investors may discuss larger allocations directly with our team, subject to availability and applicable documentation.
Your principal is returned in full at the completion of the project, typically within the 11-month term (operating window 280–360 days). A buffer of up to +60 days is allowed for construction variability, with any changes communicated in advance through your dashboard.
Yes. While the principal remains allocated to the project until completion, accrued profits can be withdrawn at any time through your dashboard. Smaller amounts are processed same-day; larger sums are released in tranches over several days.
A single 3% administration fee on capital is deducted from the returned principal at maturity. Accrued profits are paid in full — there are no performance fees, exit fees, or hidden charges.
Accruals begin on the day your funds clear and your allocation is confirmed. Each daily accrual is visible in your dashboard from that point forward.
REOCORP PTY LTD is an Australian private company focused on infrastructure, energy, resources, and essential project operations. REO provides case-specific participation opportunities connected to selected real-asset projects, with allocations administered directly through its investor platform and supporting offer documents. Company details are publicly verifiable through Australian business registers under ABN 13 620 130 958.
Yes. REO accepts participants from Australia and overseas. Registration is straightforward — create your account, complete the standard KYC check, then you can review the available package and choose your allocation through the dashboard.
Yes. REO support is available if you would like to speak with someone directly before moving forward. A team member can walk you through the opportunity, answer questions, and help make the process clearer. For larger allocations, an account manager may also be assigned to assist with setup and ongoing account support.
Once KYC is complete, allocations are funded via secure bank transfer to a designated allocation account, or through approved crypto channels. Account details and instructions are included in the offer documents.
Your dashboard provides a complete view of your position — current balance, accrual history, transaction log, withdrawal records, and personal profile — accessible at any time.
Most investors complete agreement, document review, and KYC verification within 24 hours. Allocation typically settles on the same business day once funds are received.
Waste-to-energy facilities are the value-maximisation layer of an integrated circular-economy operation — converting non-recyclable residual waste into renewable electricity while reducing landfill dependency to near zero. Facilities of this class use high-efficiency incineration with advanced flue gas cleaning that meets strict Australian and EU emissions standards, steam turbines to generate grid-ready power, and continuous emission monitoring systems for transparent compliance. The model creates dual revenue: renewable electricity sold to the grid plus ash by-products processed into construction-grade aggregate. Beyond revenue, waste-to-energy drastically reduces methane emissions from landfill, delivering significant carbon-offset benefits. Within the Urban Circular Economy Project, Package 3 captures the highest-value conversion stage, turning waste into a long-term energy revenue stream. As an asset class, waste-to-energy infrastructure sits among the strategic categories of real-asset investment in Australia, combining clean energy generation, landfill diversion, and durable, standards-driven plant assets.
Click "Start Allocation" on this page, complete the short KYC verification, and fund your account. Once your funds clear, choose Package 3, allocate your preferred amount, and your dashboard will show your active position, daily accruals, and transaction history. Package 3 remains available only while allocation capacity is open.
Waste & Recycling (Package 3: Waste-to-Energy Conversion Facility – Urban Circular Economy Project)
- Min A$5,000.00
- Max A$250,000.00
- Target daily ~ 0.70%
- Accrual days ~ 330
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Agreement Paper
Waste & Recycling (Package 3: Waste-to-Energy Conversion Facility – Urban Circular Economy Project)
- Min A$5,000.00
- Max A$250,000.00
- Target daily ~ 0.70%
- Accrual days ~ 330
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Cases Info
- Raised AmountA$136,858.00
- Goal AmountA$271,385.00
- Created At 2025-05-02