Investment Case Details
Water Security (Package 1 – Murray-Darling Basin Advanced Irrigation & Water Storage Project)
A$84,753.00
A$284,980.00
| 💧 | Co-invest in the reservoir and pump station construction — the high-capacity inland water storage and pumping backbone that safeguards a reliable, drought-resistant supply for one of Australia's most crucial food-producing regions. |
|
Daily accrual
~0.48%
per day
|
Annualised target
~175%
over term
|
Term length
280–350
days
|
| ✓ | Case ID: 8NHDZMWK5RMD |
| ✓ | Target term: 280–350 days (buffer up to +60 days with notice) |
| ✓ | Withdrawals: On request. Same-day for smaller amounts; larger sums released in tranches over several days. |
| ✓ | Capital Back: Yes — at project finish |
| ✓ | Dashboard tracking: Daily accruals, transaction history, withdrawal records, and case updates are visible through the investor account. |
| ✓ | Updates: 15–20 minute phone briefing with a dedicated team member on request. |
| ⓘ | All figures are targets, not guarantees. Capital is at risk. Full terms in the offer documents. |
| 01 | Package Summary |
The Murray-Darling Basin Advanced Irrigation & Water Storage Project is designed to safeguard the agricultural productivity of one of Australia's most crucial food-producing regions. By building high-capacity inland reservoirs and modern pumping facilities, this package ensures a reliable, drought-resistant water supply for farms and communities across the Basin.
Unlike traditional open-channel irrigation systems, the infrastructure here is engineered to minimise evaporation, maximise delivery efficiency, and create strategic reserves for dry-season stability.
| 02 | Scope of Works |
Reservoir and pump station construction is the core water security asset — without storage and pumping capacity, no large-scale irrigation system can function. Strategic inland reserves shield the region from drought and seasonal shortages, are designed for a 40+ year lifespan with minimal environmental impact, and can be expanded modularly to support new agricultural areas.
| 03 | Schedule & Milestones |
| 1 | Mobilisation and site survey |
| 2 | Reservoir earthworks and lining |
| 3 | Pump station installation (with redundancy) |
| 4 | Water intake structures (sediment screens, fish-friendly) |
| 5 | Pipeline foundation base works |
| 6 | Access roads, embankments, and civil works |
| 7 | Monitoring systems and commissioning |
| 04 | Use of Funds |
| Reservoir construction (earthworks, lining) |
| Pump station installation (energy-efficient, redundant) |
| Water intake structures |
| Pipeline foundations |
| Access roads and civil works |
| Monitoring systems (flow meters, telemetry) |
| Commissioning and compliance |
| 05 | How the Process Works |
From start to allocation in 5 clear steps
| 1 | Start AllocationClick "Start Allocation" on this page to begin |
| 2 | Complete KYCShort identity verification in your account |
| 3 | Receive DocumentsPDS + TMD (retail) or IM (wholesale) by email |
| 4 | Fund Your AccountBank transfer to a secure allocation account, or approved crypto |
| 5 | Allocate & TrackAllocation confirmed on cleared funds; track accruals through your dashboard |
| ⓘ | Returns are targets, not guarantees; capital is at risk. Application monies are received into a secure allocation account designated for the offer. |
| 06 | Fees |
| 3% | Management fee — of principal per term, deducted from principal at maturity. Profits untouched. |
| ⚠ | Key Risks |
Construction and schedule; geotechnical and hydrological conditions; water allocation and environmental permitting; pumping equipment integration; seasonal flow variability; cost escalation; counterparty and operational dependencies.
| ★ | Strategic Rationale |
|
💧
Core Water Security Asset
Without storage and pumping capacity, no large-scale irrigation system can function.
|
🌦
Climate Resilience
Strategic inland reserves shield the region from drought and seasonal shortages.
|
|
🏗
Long-Term Operation
Designed for a 40+ year lifespan with minimal environmental impact.
|
🚀
Scalable & Modular
Reservoir and pumping systems can be expanded to support new agricultural areas.
|
Comments
Review
Package 1 targets approximately 0.48% in daily accruals over a 10-month term (operating window 280–350 days) — translating to roughly 154% total over a typical 320-day cycle, equivalent to an annualised target of around 175%. Returns are tracked transparently from the day your allocation is confirmed, with full conditions detailed in the offer documents.
Allocations to Package 1 start at A$500 and extend up to A$30,000 per investor. Wholesale and Professional investors may discuss larger allocations directly with our team, subject to availability and applicable documentation.
Your principal is returned in full at the completion of the project, typically within the 10-month term (operating window 280–350 days). A buffer of up to +60 days is allowed for construction variability, with any changes communicated in advance through your dashboard.
Yes. While the principal remains allocated to the project until completion, accrued profits can be withdrawn at any time through your dashboard. Smaller amounts are processed same-day; larger sums are released in tranches over several days.
A single 3% administration fee on capital is deducted from the returned principal at maturity. Accrued profits are paid in full — there are no performance fees, exit fees, or hidden charges.
Accruals begin on the day your funds clear and your allocation is confirmed. Each daily accrual is visible in your dashboard from that point forward.
REOCORP PTY LTD is an Australian private company focused on infrastructure, energy, resources, and essential project operations. REO provides case-specific participation opportunities connected to selected real-asset projects, with allocations administered directly through its investor platform and supporting offer documents. Company details are publicly verifiable through Australian business registers under ABN 13 620 130 958.
Yes. REO accepts participants from Australia and overseas. Registration is straightforward — create your account, complete the standard KYC check, then you can review the available package and choose your allocation through the dashboard.
Yes. REO support is available if you would like to speak with someone directly before moving forward. A team member can walk you through the opportunity, answer questions, and help make the process clearer. For larger allocations, an account manager may also be assigned to assist with setup and ongoing account support.
Once KYC is complete, allocations are funded via secure bank transfer to a designated allocation account, or through approved crypto channels. Account details and instructions are included in the offer documents.
Your dashboard provides a complete view of your position — current balance, accrual history, transaction log, withdrawal records, and personal profile — accessible at any time.
Most investors complete agreement, document review, and KYC verification within 24 hours. Allocation typically settles on the same business day once funds are received.
Water storage and pumping infrastructure is the foundational asset of any large-scale irrigation system — without reservoirs to hold strategic reserves and pump stations to move water on demand, no downstream distribution or on-farm delivery can function. Civil assets of this class are among the most enduring real-asset categories, engineered for 40+ year operational lifespans with minimal seepage and evaporation. In the Murray-Darling Basin — one of Australia's most crucial food-producing regions — drought-resistant storage provides climate resilience, shielding agriculture from seasonal shortages while supporting farms and communities across the Basin. The infrastructure is scalable and modular, expandable to serve new agricultural areas as demand grows. Within this project, Package 1 establishes the storage and pumping backbone that every later pipeline and on-farm stage depends on. As an asset class, water security infrastructure sits among the most durable categories of real-asset investment in Australia, underpinned by essential agricultural and community water demand.
Click "Start Allocation" on this page, complete the short KYC verification, and fund your account. Once your funds clear, choose Package 1, allocate your preferred amount, and your dashboard will show your active position, daily accruals, and transaction history. Package 1 remains available only while allocation capacity is open.
Water Security (Package 1: Reservoir & Pump Station Construction – Murray-Darling Basin Advanced Irrigation & Water Storage Project)
- Min A$500.00
- Max A$30,000.00
- Target daily ~ 0.48%
- Accrual days ~ 320
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Agreement Paper
Water Security (Package 1: Reservoir & Pump Station Construction – Murray-Darling Basin Advanced Irrigation & Water Storage Project)
- Min A$500.00
- Max A$30,000.00
- Target daily ~ 0.48%
- Accrual days ~ 320
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Cases Info
- Raised AmountA$84,753.00
- Goal AmountA$284,980.00
- Created At 2025-05-18