Investment Case Details
Water Security (Package 2 – Coastal Desalination & Water Resilience Project)
A$93,627.00
A$604,172.00
| 💧 | Co-invest in the core desalination plant construction — the heart of the project that transforms seawater into clean, potable water using advanced reverse osmosis technology engineered for efficiency and long-term reliability. |
|
Daily accrual
~0.50%
per day
|
Annualised target
~182%
over term
|
Term length
280–350
days
|
| ✓ | Case ID: BFSPX4WEH536 |
| ✓ | Target term: 280–350 days (buffer up to +60 days with notice) |
| ✓ | Withdrawals: On request. Same-day for smaller amounts; larger sums released in tranches over several days. |
| ✓ | Capital Back: Yes — at project finish |
| ✓ | Dashboard tracking: Daily accruals, transaction history, withdrawal records, and case updates are visible through the investor account. |
| ✓ | Updates: 15–20 minute phone briefing with a dedicated team member on request. |
| ⓘ | All figures are targets, not guarantees. Capital is at risk. Full terms in the offer documents. |
| 01 | Package Summary |
Package 2 delivers the heart of the Coastal Desalination & Water Resilience Project — the construction of the main desalination facility itself. This stage transforms seawater into clean, potable water using advanced reverse osmosis (RO) technology, integrated with pre-treatment and post-treatment systems to meet the strictest quality standards.
The facility will be engineered for maximum efficiency, low operating costs, and long-term reliability under variable demand conditions.
| 02 | Scope of Works |
The desalination plant is the high value-add stage — converting raw seawater into a market-ready product and unlocking revenue streams. Leading-edge energy recovery minimises operational costs, the facility enables binding long-term supply agreements with municipalities and industry, and globally proven RO technology keeps maintenance risk low.
| 03 | Schedule & Milestones |
| 1 | Mobilisation and plant site preparation |
| 2 | Pre-treatment unit (filtration, dosing) installation |
| 3 | Reverse osmosis train (modular membrane rack) build |
| 4 | Energy recovery device installation (pressure exchangers) |
| 5 | Post-treatment system (remineralisation, disinfection) setup |
| 6 | Plant civil works, piping, electrical, control rooms |
| 7 | SCADA automation integration and commissioning |
| 04 | Use of Funds |
| Pre-treatment units (multi-stage filtration, dosing) |
| Reverse osmosis trains (modular membrane racks) |
| Energy recovery devices (pressure exchangers, turbochargers) |
| Post-treatment systems (remineralisation, disinfection) |
| Plant civil works, piping, and electrical systems |
| Automation and monitoring (SCADA) |
| Commissioning and optimisation |
| 05 | How the Process Works |
From start to allocation in 5 clear steps
| 1 | Start AllocationClick "Start Allocation" on this page to begin |
| 2 | Complete KYCShort identity verification in your account |
| 3 | Receive DocumentsPDS + TMD (retail) or IM (wholesale) by email |
| 4 | Fund Your AccountBank transfer to a secure allocation account, or approved crypto |
| 5 | Allocate & TrackAllocation confirmed on cleared funds; track accruals through your dashboard |
| ⓘ | Returns are targets, not guarantees; capital is at risk. Application monies are received into a secure allocation account designated for the offer. |
| 06 | Fees |
| 3% | Management fee — of principal per term, deducted from principal at maturity. Profits untouched. |
| ⚠ | Key Risks |
Construction and schedule; RO and treatment technology integration; energy and membrane performance; water quality and environmental compliance; offtake contract performance; cost escalation; counterparty and operational dependencies.
| ★ | Strategic Rationale |
|
💎
High Value-Add Stage
Converts raw seawater into market-ready product, unlocking revenue streams.
|
⚡
Energy Efficiency
Incorporates leading-edge recovery systems to minimise operational costs.
|
|
📄
Long-Term Contracts
Enables binding supply agreements with municipalities and industry.
|
🚀
Scalable & Modular
Future capacity increases can be added with minimal disruption.
|
Comments
Review
Package 2 targets approximately 0.50% in daily accruals over a 10-month term (operating window 280–350 days) — translating to roughly 160% total over a typical 320-day cycle, equivalent to an annualised target of around 182%. Returns are tracked transparently from the day your allocation is confirmed, with full conditions detailed in the offer documents.
Allocations to Package 2 start at A$20,000 and extend up to A$200,000 per investor. Wholesale and Professional investors may discuss larger allocations directly with our team, subject to availability and applicable documentation.
Your principal is returned in full at the completion of the project, typically within the 10-month term (operating window 280–350 days). A buffer of up to +60 days is allowed for construction variability, with any changes communicated in advance through your dashboard.
Yes. While the principal remains allocated to the project until completion, accrued profits can be withdrawn at any time through your dashboard. Smaller amounts are processed same-day; larger sums are released in tranches over several days.
A single 3% administration fee on capital is deducted from the returned principal at maturity. Accrued profits are paid in full — there are no performance fees, exit fees, or hidden charges.
Accruals begin on the day your funds clear and your allocation is confirmed. Each daily accrual is visible in your dashboard from that point forward.
REOCORP PTY LTD is an Australian private company focused on infrastructure, energy, resources, and essential project operations. REO provides case-specific participation opportunities connected to selected real-asset projects, with allocations administered directly through its investor platform and supporting offer documents. Company details are publicly verifiable through Australian business registers under ABN 13 620 130 958.
Yes. REO accepts participants from Australia and overseas. Registration is straightforward — create your account, complete the standard KYC check, then you can review the available package and choose your allocation through the dashboard.
Yes. REO support is available if you would like to speak with someone directly before moving forward. A team member can walk you through the opportunity, answer questions, and help make the process clearer. For larger allocations, an account manager may also be assigned to assist with setup and ongoing account support.
Once KYC is complete, allocations are funded via secure bank transfer to a designated allocation account, or through approved crypto channels. Account details and instructions are included in the offer documents.
Your dashboard provides a complete view of your position — current balance, accrual history, transaction log, withdrawal records, and personal profile — accessible at any time.
Most investors complete agreement, document review, and KYC verification within 24 hours. Allocation typically settles on the same business day once funds are received.
Desalination plants are the value-conversion core of any coastal water security operation — the stage where raw seawater is transformed into clean, potable water that municipalities and industry pay for under long-term supply contracts. Facilities of this class use proven reverse osmosis (RO) technology with multi-stage pre-treatment, modular membrane trains, energy recovery devices that cut energy consumption by up to 45%, and post-treatment remineralisation to meet the strictest drinking-water standards. Producing a market-ready product unlocks revenue streams and enables binding offtake agreements, while globally proven RO technology and SCADA automation keep maintenance and operational risk low. Within the Coastal Desalination & Water Resilience Project, Package 2 captures the high value-add stage, with modular design allowing future capacity increases with minimal disruption. As an asset class, desalination infrastructure sits among the strategic, revenue-generating categories of real-asset investment in Australia, underpinned by essential, climate-independent water demand.
Click "Start Allocation" on this page, complete the short KYC verification, and fund your account. Once your funds clear, choose Package 2, allocate your preferred amount, and your dashboard will show your active position, daily accruals, and transaction history. Package 2 remains available only while allocation capacity is open.
Water Security (Package 2: Core Desalination Plant Construction – Coastal Desalination & Water Resilience Project)
- Min A$20,000.00
- Max A$200,000.00
- Target daily ~ 0.50%
- Accrual days ~ 320
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Agreement Paper
Water Security (Package 2: Core Desalination Plant Construction – Coastal Desalination & Water Resilience Project)
- Min A$20,000.00
- Max A$200,000.00
- Target daily ~ 0.50%
- Accrual days ~ 320
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Cases Info
- Raised AmountA$93,627.00
- Goal AmountA$604,172.00
- Created At 2025-04-25