Investment Case Details
Water Security (Package 1 – Northern Inland Water Security Program)
A$94,841.00
A$278,585.00
| 💧 | Co-invest in the dam and reservoir construction stage of a large-scale inland water security program. |
|
Daily accrual
~0.35%
per day
|
Annualised target
~127%
over term
|
Term length
300–400
days
|
| ✓ | Case ID: H2D9KV4UCGO2 |
| ✓ | Target term: 300–400 days (buffer up to +60 days with notice) |
| ✓ | Withdrawals: On request. Same-day for smaller amounts; larger sums released in tranches over several days. |
| ✓ | Capital Back: Yes — at project finish |
| ✓ | Dashboard tracking: Daily accruals, transaction history, withdrawal records, and case updates are visible through the investor account. |
| ✓ | Updates: 15–20 minute phone briefing with a dedicated team member on request. |
| ⓘ | All figures are targets, not guarantees. Capital is at risk. Full terms in the offer documents. |
| 01 | Package Summary |
The Northern Inland Water Security Program safeguards water supplies for agriculture, industry, and regional communities across Australia's drought-prone zones. The program is designed to capture, hold, and release water on command — securing year-round availability through drought and flood cycles.
Package 1 covers the core civil works to establish a large-scale dam and reservoir system capable of storing hundreds of gigalitres of water. This foundation enables the subsequent treatment, distribution, and monitoring phases.
| 02 | Scope of Works |
Australia's inland regions are facing more frequent and longer droughts, while existing storage capacity hasn't kept pace. Large-scale dam and reservoir infrastructure is the most proven long-term solution — with asset lives measured in decades, not years. Package 1 funds the foundational civil works that make the rest of the program possible: without secure storage, there is no system to treat or distribute from.
| 03 | Schedule & Milestones |
| 1 | Mobilisation and site preparation |
| 2 | Dam wall and embankment construction |
| 3 | Spillway and flood control fit-out |
| 4 | Reservoir lining installation and QA |
| 5 | Environmental safeguards and access roads |
| 6 | Commissioning checks and handover |
| 04 | Use of Funds |
| Site preparation and earthworks (clearing, excavation, foundations) |
| Dam wall construction (RCC and rock-fill embankments) |
| Spillway and flood control systems |
| Reservoir lining and seepage control |
| Access and service roads |
| Environmental safeguards (fish ladders, habitat offsets, erosion control) |
| 05 | How the Process Works |
From start to allocation in 5 clear steps
| 1 | Start AllocationClick "Start Allocation" on this page to begin |
| 2 | Complete KYCShort identity verification in your account |
| 3 | Receive DocumentsPDS + TMD (retail) or IM (wholesale) by email |
| 4 | Fund Your AccountBank transfer to a secure allocation account, or approved crypto |
| 5 | Allocate & TrackAllocation confirmed on cleared funds; track accruals through your dashboard |
| ⓘ | Returns are targets, not guarantees; capital is at risk. Application monies are received into a secure allocation account designated for the offer. |
| 06 | Fees |
| 3% | Management fee — of principal per term, deducted from principal at maturity. Profits untouched. |
| ⚠ | Key Risks |
Construction and schedule; geotechnical/hydrology; regulatory and environmental approvals; cost escalation; counterparty; downstream operational dependencies.
| ★ | Strategic Rationale |
|
🏗
Foundational Infrastructure
Without this, later stages like purification and distribution can't operate.
|
🛡
Long-Term Security
Water storage builds resilience during prolonged droughts.
|
|
📈
Regional Economic Impact
Supports agriculture, mining, and urban growth in inland areas.
|
⏳
High Asset Longevity
Dam structures have operational lifespans exceeding 50 years.
|
Comments
Review
Package 1 targets approximately 127% over a 300–400 day term, with daily accruals of around 0.35% credited to your dashboard. Returns are tracked transparently from the day your allocation is confirmed, with full conditions detailed in the offer documents.
Allocations to Package 1 start at A$400 and extend up to A$20,000 per investor. Wholesale and Professional investors may discuss larger allocations directly with our team, subject to availability and applicable documentation.
Your principal is returned in full at the completion of the project, typically within the 300–400 day term. A buffer of up to +60 days is allowed for construction variability, with any changes communicated in advance through your dashboard.
Yes. While the principal remains allocated to the project until completion, accrued profits can be withdrawn at any time through your dashboard. Smaller amounts are processed same-day; larger sums are released in tranches over several days.
A single 3% administration fee on capital is deducted from the returned principal at maturity. Accrued profits are paid in full — there are no performance fees, exit fees, or hidden charges.
Accruals begin on the day your funds clear and your allocation is confirmed. Each daily accrual is visible in your dashboard from that point forward.
REOCORP PTY LTD is an Australian private company focused on infrastructure, energy, resources, and essential project operations. REO provides case-specific participation opportunities connected to selected real-asset projects, with allocations administered directly through its investor platform and supporting offer documents. Company details are publicly verifiable through Australian business registers under ABN 13 620 130 958.
Yes. REO accepts participants from Australia and overseas. Registration is straightforward — create your account, complete the standard KYC check, then you can review the available package and choose your allocation through the dashboard.
Yes. REO support is available if you would like to speak with someone directly before moving forward. A team member can walk you through the opportunity, answer questions, and help make the process clearer. For larger allocations, an account manager may also be assigned to assist with setup and ongoing account support.
Once KYC is complete, allocations are funded via secure bank transfer to a designated allocation account, or through approved crypto channels. Account details and instructions are included in the offer documents.
Your dashboard provides a complete view of your position — current balance, accrual history, transaction log, withdrawal records, and personal profile — accessible at any time.
Most investors complete agreement, document review, and KYC verification within 24 hours. Allocation typically settles on the same business day once funds are received.
Package 1 funds the civil works that create the program's storage base — capable of holding hundreds of gigalitres of water and engineered to capture, hold, and release supply on command. Without this foundation, no later stage of the Northern Inland Water Security Program — treatment, distribution, or monitoring — can operate. Large-scale dams and reservoirs are also among the most enduring real-asset categories, with operational lifespans of 50+ years and sustained demand across agriculture, mining, and inland urban growth.
Click "Start Allocation" on this page, complete the short KYC verification, and fund your account. Once your funds clear, choose Package 1, allocate your preferred amount, and your dashboard will show your active position, daily accruals, and transaction history. Package 1 remains available only while allocation capacity is open.
Water Security (Package 1: Dam & Reservoir Infrastructure – Northern Inland Water Security Program)
- Min A$400.00
- Max A$20,000.00
- Target daily ~ 0.35%
- Accrual days ~ 350
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Agreement Paper
Water Security (Package 1: Dam & Reservoir Infrastructure – Northern Inland Water Security Program)
- Min A$400.00
- Max A$20,000.00
- Target daily ~ 0.35%
- Accrual days ~ 350
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Cases Info
- Raised AmountA$94,841.00
- Goal AmountA$278,585.00
- Created At 2025-03-22