Investment Case Details
Water Security (Package 3 – Coastal Desalination & Water Resilience Project)
A$182,546.00
A$1,416,781.00
| 💧 | Co-invest in the distribution and storage infrastructure — the final stage that delivers clean, treated water from the plant to municipalities, industry, and agricultural users with reliable, high-quality supply. |
|
Daily accrual
~0.47%
per day
|
Annualised target
~172%
over term
|
Term length
260–330
days
|
| ✓ | Case ID: N6VHX45ZUQBF |
| ✓ | Target term: 260–330 days (buffer up to +60 days with notice) |
| ✓ | Withdrawals: On request. Same-day for smaller amounts; larger sums released in tranches over several days. |
| ✓ | Capital Back: Yes — at project finish |
| ✓ | Dashboard tracking: Daily accruals, transaction history, withdrawal records, and case updates are visible through the investor account. |
| ✓ | Updates: 15–20 minute phone briefing with a dedicated team member on request. |
| ⓘ | All figures are targets, not guarantees. Capital is at risk. Full terms in the offer documents. |
| 01 | Package Summary |
Package 3 focuses on delivering the final stage of the Coastal Desalination & Water Resilience Project — building the storage and distribution systems that deliver clean, treated water from the plant to municipalities, industry, and agricultural users.
This package ensures that the product water maintains quality during transport and that supply is reliable, even during peak demand or emergency situations.
| 02 | Scope of Works |
Package 3 is the revenue delivery stage — the final step before water reaches paying customers. Backup power and redundant systems ensure uninterrupted supply, large storage capacity smooths fluctuations between production and consumption, and real-time monitoring guarantees water meets regulatory standards while expanding clean water access to entire communities and industrial hubs.
| 03 | Schedule & Milestones |
| 1 | Mobilisation and distribution network planning |
| 2 | Main transmission pipeline laying |
| 3 | Water storage reservoir (elevated and ground-level) build |
| 4 | Pumping station (booster pump) installation |
| 5 | SCADA distribution control system integration |
| 6 | Backup systems (emergency power, redundant lines) |
| 7 | Quality monitoring stations and commissioning |
| 04 | Use of Funds |
| Main transmission pipelines (corrosion-resistant) |
| Water storage reservoirs (elevated and ground-level) |
| Pumping stations (booster pumps) |
| Distribution control systems (SCADA) |
| Backup systems (emergency power, redundant lines) |
| Quality monitoring stations (inline sensors) |
| Commissioning and first supply |
| 05 | How the Process Works |
From start to allocation in 5 clear steps
| 1 | Start AllocationClick "Start Allocation" on this page to begin |
| 2 | Complete KYCShort identity verification in your account |
| 3 | Receive DocumentsPDS + TMD (retail) or IM (wholesale) by email |
| 4 | Fund Your AccountBank transfer to a secure allocation account, or approved crypto |
| 5 | Allocate & TrackAllocation confirmed on cleared funds; track accruals through your dashboard |
| ⓘ | Returns are targets, not guarantees; capital is at risk. Application monies are received into a secure allocation account designated for the offer. |
| 06 | Fees |
| 3% | Management fee — of principal per term, deducted from principal at maturity. Profits untouched. |
| ⚠ | Key Risks |
Construction and schedule; pipeline route and network integration; storage and pumping equipment performance; water quality and drinking-water compliance; offtake and supply contract performance; cost escalation; counterparty and operational dependencies.
| ★ | Strategic Rationale |
|
💰
Revenue Delivery Stage
This is the final step before water reaches paying customers.
|
🛡
System Resilience
Backup power and redundant systems ensure uninterrupted supply.
|
|
🌏
Regional Impact
Expands clean water access to entire communities and industrial hubs.
|
📊
Demand Balancing
Large storage capacity smooths fluctuations between production and consumption.
|
Comments
Review
Package 3 targets approximately 0.47% in daily accruals over a 10-month term (operating window 260–330 days) — translating to roughly 141% total over a typical 300-day cycle, equivalent to an annualised target of around 172%. Returns are tracked transparently from the day your allocation is confirmed, with full conditions detailed in the offer documents.
Allocations to Package 3 start at A$5,000 and extend up to A$100,000 per investor. Wholesale and Professional investors may discuss larger allocations directly with our team, subject to availability and applicable documentation.
Your principal is returned in full at the completion of the project, typically within the 10-month term (operating window 260–330 days). A buffer of up to +60 days is allowed for construction variability, with any changes communicated in advance through your dashboard.
Yes. While the principal remains allocated to the project until completion, accrued profits can be withdrawn at any time through your dashboard. Smaller amounts are processed same-day; larger sums are released in tranches over several days.
A single 3% administration fee on capital is deducted from the returned principal at maturity. Accrued profits are paid in full — there are no performance fees, exit fees, or hidden charges.
Accruals begin on the day your funds clear and your allocation is confirmed. Each daily accrual is visible in your dashboard from that point forward.
REOCORP PTY LTD is an Australian private company focused on infrastructure, energy, resources, and essential project operations. REO provides case-specific participation opportunities connected to selected real-asset projects, with allocations administered directly through its investor platform and supporting offer documents. Company details are publicly verifiable through Australian business registers under ABN 13 620 130 958.
Yes. REO accepts participants from Australia and overseas. Registration is straightforward — create your account, complete the standard KYC check, then you can review the available package and choose your allocation through the dashboard.
Yes. REO support is available if you would like to speak with someone directly before moving forward. A team member can walk you through the opportunity, answer questions, and help make the process clearer. For larger allocations, an account manager may also be assigned to assist with setup and ongoing account support.
Once KYC is complete, allocations are funded via secure bank transfer to a designated allocation account, or through approved crypto channels. Account details and instructions are included in the offer documents.
Your dashboard provides a complete view of your position — current balance, accrual history, transaction log, withdrawal records, and personal profile — accessible at any time.
Most investors complete agreement, document review, and KYC verification within 24 hours. Allocation typically settles on the same business day once funds are received.
Water distribution and storage infrastructure is the revenue-delivery layer of any desalination operation — without transmission pipelines, storage reservoirs, pumping stations, and monitoring, the clean water produced cannot reach the municipalities, industry, and agricultural users who pay for it. Infrastructure of this class combines durable civil assets (corrosion-resistant pipelines, elevated and ground-level reservoirs with multi-decade lifespans) with SCADA-integrated control for pressure management and leak detection, plus backup power and redundant pump lines to guarantee continuous supply. Large storage capacity smooths fluctuations between production and consumption, while inline quality monitoring ensures compliance with national drinking-water standards. Within the Coastal Desalination & Water Resilience Project, Package 3 is the final step before water reaches paying customers, expanding clean water access across entire communities and industrial hubs. As an asset class, water distribution infrastructure sits among the most durable and standards-driven categories of real-asset investment in Australia, with revenue underpinned by essential, long-term water supply demand.
Click "Start Allocation" on this page, complete the short KYC verification, and fund your account. Once your funds clear, choose Package 3, allocate your preferred amount, and your dashboard will show your active position, daily accruals, and transaction history. Package 3 remains available only while allocation capacity is open.
Water Security (Package 3: Distribution & Storage Infrastructure – Coastal Desalination & Water Resilience Project)
- Min A$5,000.00
- Max A$100,000.00
- Target daily ~ 0.47%
- Accrual days ~ 300
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Agreement Paper
Water Security (Package 3: Distribution & Storage Infrastructure – Coastal Desalination & Water Resilience Project)
- Min A$5,000.00
- Max A$100,000.00
- Target daily ~ 0.47%
- Accrual days ~ 300
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Cases Info
- Raised AmountA$182,546.00
- Goal AmountA$1,416,781.00
- Created At 2025-06-15