Investment Case Details
Water Security (Package 3 – Northern Inland Water Security Program)
A$293,741.00
A$1,374,190.00
| 💧 | Co-invest in the distribution and monitoring network — the final stage of a large-scale inland water security program. |
|
Daily accrual
~0.65%
per day
|
Annualised target
~237%
over term
|
Term length
200–300
days
|
| ✓ | Case ID: T4KVHCPZ1T6G |
| ✓ | Target term: 200–300 days (buffer up to +60 days with notice) |
| ✓ | Investor positions: Limited to 15 — allocated on a first-come basis while open |
| ✓ | Withdrawals: On request. Same-day for smaller amounts; larger sums released in tranches over several days. |
| ✓ | Capital Back: Yes — at project finish |
| ✓ | Dashboard tracking: Daily accruals, transaction history, withdrawal records, and case updates are visible through the investor account. |
| ✓ | Updates: 15–20 minute phone briefing with a dedicated team member on request. Larger allocations are supported by a named account manager. |
| ⓘ | All figures are targets, not guarantees. Capital is at risk. Full terms in the offer documents. |
| 01 | Package Summary |
Package 3 delivers the final stage of the Northern Inland Water Security Program — a robust network of pipelines, pumping stations, and monitoring systems that carry treated water from the plant to communities and industries across the region.
This is the distribution and monitoring layer that converts stored, treated water into usable supply at the point of demand. With pipeline runs of over 300 km, SCADA-linked monitoring, and adaptive design, the network is built to serve current users and accept future water sources without redesign.
| 02 | Scope of Works |
Storage and treatment only deliver value when the water reaches the end user. Package 3 is the monetisation layer of the program — the network that turns infrastructure into service revenue from communities, agriculture, and industry. Pipelines have operational lives of 50–80 years, and SCADA monitoring keeps unaccounted losses low across the life of the asset.
| 03 | Schedule & Milestones |
| 1 | Route survey, easements, and corridor preparation |
| 2 | Trunk pipeline installation and pressure testing |
| 3 | Pumping stations and storage towers commissioning |
| 4 | Smart meters and leak-detection sensor deployment |
| 5 | SCADA integration and remote monitoring activation |
| 6 | Network handover and start of full distribution |
| 04 | Use of Funds |
| High-capacity pipeline supply, trenching, and installation |
| Pumping stations and pressure-management equipment |
| Storage towers, valves, and emergency shut-off systems |
| Smart meters, leak-detection sensors, and field instrumentation |
| SCADA platform, control centre, and remote monitoring integration |
| Commissioning, regulatory compliance, and operator handover |
| 05 | How the Process Works |
From start to allocation in 5 clear steps
| 1 | Start AllocationClick "Start Allocation" on this page to begin |
| 2 | Complete KYCShort identity verification in your account |
| 3 | Receive DocumentsPDS + TMD (retail) or IM (wholesale) by email |
| 4 | Fund Your AccountBank transfer to a secure allocation account, or approved crypto |
| 5 | Allocate & TrackAllocation confirmed on cleared funds; track accruals through your dashboard |
| ⓘ | Returns are targets, not guarantees; capital is at risk. Application monies are received into a secure allocation account designated for the offer. |
| 06 | Fees |
| 3% | Management fee — of principal per term, deducted from principal at maturity. Profits untouched. |
| ⚠ | Key Risks |
Construction and schedule; easement and right-of-way; regulatory and environmental approvals; pipeline integrity and corrosion; SCADA and cybersecurity; cost escalation; counterparty and offtake dependencies.
| ★ | Strategic Rationale |
|
🚰
Final Step to Market Delivery
Converts stored and treated water into an accessible resource for communities and industry.
|
💰
Revenue-Generating Stage
Distribution fees from multiple sectors — municipal, agricultural, and industrial.
|
|
📡
Asset Security via SCADA
Remote monitoring reduces theft, damage, and unaccounted water losses across the network.
|
🔄
Future-Proof Network
Adaptable to desalinated or recycled water in the future without structural rework.
|
Comments
Review
Package 3 targets approximately 0.65% in daily accruals over a 200–300 day term — translating to roughly 162% total over a typical 250-day cycle, equivalent to an annualised target of around 237%. Returns are tracked transparently from the day your allocation is confirmed, with full conditions detailed in the offer documents.
Allocations to Package 3 start at A$60,000 and extend up to A$500,000 per investor. Wholesale and Professional investors may discuss larger allocations directly with our team, subject to availability and applicable documentation.
Your principal is returned in full at the completion of the project, typically within the 200–300 day term. A buffer of up to +60 days is allowed for construction variability, with any changes communicated in advance through your dashboard.
Yes. While the principal remains allocated to the project until completion, accrued profits can be withdrawn at any time through your dashboard. Smaller amounts are processed same-day; larger sums are released in tranches over several days.
A single 3% administration fee on capital is deducted from the returned principal at maturity. Accrued profits are paid in full — there are no performance fees, exit fees, or hidden charges.
Accruals begin on the day your funds clear and your allocation is confirmed. Each daily accrual is visible in your dashboard from that point forward.
REOCORP PTY LTD is an Australian private company focused on infrastructure, energy, resources, and essential project operations. REO provides case-specific participation opportunities connected to selected real-asset projects, with allocations administered directly through its investor platform and supporting offer documents. Company details are publicly verifiable through Australian business registers under ABN 13 620 130 958.
Eligible investors based in Australia and overseas are welcome. A standard KYC process classifies investors as Retail or Wholesale / Professional, ensuring the correct offer documentation applies — PDS and TMD for Retail investors, IM for Wholesale and Professional investors. Onboarding is fully digital and typically completed within 24 hours.
Yes. Support is available throughout the process — a 15–20 minute phone briefing with a team member can be arranged on request. Larger allocations are supported by a named account manager who remains available for the duration of the term.
Once KYC is complete, allocations are funded via secure bank transfer to a designated allocation account, or through approved crypto channels. Account details and instructions are included in the offer documents.
Your dashboard provides a complete view of your position — current balance, accrual history, transaction log, withdrawal records, and personal profile — accessible at any time.
Most investors complete agreement, document review, and KYC verification within 24 hours. Allocation typically settles on the same business day once funds are received.
Water distribution and monitoring networks are the revenue-generating layer of essential water infrastructure. Pipeline assets carry operational lifespans of 50–80 years, while SCADA-linked monitoring keeps unaccounted losses low and protects asset integrity across the life of the network. Revenue is supported by distribution tariffs from municipal, agricultural, and industrial users, and the architecture is built to accept future inputs such as desalinated or recycled water without structural redesign. As an asset class, it sits among the most stable categories of real-asset investment in Australia.
Click "Start Allocation" on this page, complete the short KYC verification, and fund your account. Once your funds clear, choose Package 3, allocate your preferred amount, and your dashboard will show your active position, daily accruals, and transaction history. Package 3 remains available only while allocation capacity is open.
Water Security (Package 3: Distribution & Monitoring Network – Northern Inland Water Security Program)
- Min A$60,000.00
- Max A$500,000.00
- Target daily ~ 0.65%
- Accrual days ~ 250
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Agreement Paper
Water Security (Package 3: Distribution & Monitoring Network – Northern Inland Water Security Program)
- Min A$60,000.00
- Max A$500,000.00
- Target daily ~ 0.65%
- Accrual days ~ 250
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Cases Info
- Raised AmountA$293,741.00
- Goal AmountA$1,374,190.00
- Created At 2025-06-10